Bespoke technical conferences with full peer review

Thank you for your purchase

Billing Details

Your Order

Product Subtotal
Installation of platform smoke exhaust to the three 40-year-old Melbourne Underground Rail Loop stations  × 1
Details Information:
£65.00
TVS and VAC interface in arid climate regions metro project  × 2
Details Information:
£130.00
Integrating fire modelling and machine learning techniques to predict the probability of life safety in naturally ventilated road tunnels  × 1
Details Information:
£65.00
Assessment on the use of stall-free axial fans in underground ventilation systems  × 2
Details Information:
£130.00
Control of the Tunnel Ventilation System of a Road Tunnel Using Artificial Intelligence  × 1
Details Information:
£65.00
Estimating maximum pressure gradients of compression waves in slab track tunnels  × 1
Details Information:
£65.00
Simulation of air temperatures in the rail tunnel network of Stuttgart 21 to assess the risk of frost in fire-fighting water pipes  × 1
Details Information:
£65.00
Analysis of radiation in the region of a train tire in an open station  × 1
Details Information:
£65.00
Subtotal £650.00
Total £650.00 GBP
  • Make your payment directly into our bank account. Please use your Order ID as the payment reference. Your registration will not be completed until the funds have cleared. All payments to be made within 30 days on receipt of this invoice.

Your personal data will be used to process your order, support your experience throughout this website, and for other purposes described in our privacy policy.